Tender Description Value Due Date
1. Sector:Roads Construction of 4 laning Greenfield corridor from Suara (Sasaram) at Ch. 0.000 to Garhani (at SH-12) at Ch 74.432 Package-1 of Patna-Arrah-Sasaram corridor of NH-119A in the State of bihar on HAM Mode 1143.36 Cr 11.43 Bn
10 Days to go
30-Apr-2024
TOI : 62887052 India | Bihar
2. Sector:Power Plant Commissioning Support and Comprehensive Operation and Maintenance Contract of Coal Based Supercritical Buxar Thermal Power Project (BTPP) (2x660 MW)
Commissioning Support and Comprehensive Operation and Maintenance Contract of Coal Based Supercritical Buxar Thermal Power Project (BTPP) (2x660 MW) at Chausa, Dist-Buxar, bihar, India
952.95 Cr 9.52 Bn
26 Days to go
16-May-2024
TOI : 64546872 India | Bihar
3. Sector:Roads Construction of 4-Lane Greenfield Highway from Parsarma Ch.0.000 to Bishnupur (Near Pipra) Ch.36.450 including Spur Connectivity of 1.749 km with Supaul (Parsarma-Araria Pkg-1) of NH-327E in the state of bihar 909.45 Cr 9.09 Bn
3 Days to go
23-Apr-2024
TOI : 67704650 India | Bihar
4. Sector:Roads Construction of 4Lane GF Highway from Raghunathpur Ch.71.500 to Araria Ch107.142 with a Trumpet Interchange to connect at NH27 of NH327E (Parsarma-Araria Pkg3)in the state of bihar on HAM 904.92 Cr 9.04 Bn
3 Days to go
23-Apr-2024
TOI : 67773663 India | Bihar
5. Sector:Roads Construction of 4-Lane Greenfield Highway from Bishnupur (Near Pipra) Ch.36.450 to Raghunathpur Ch.71.500 including Spur Connectivity of 3.288 km with (Parsarma-Araria Pkg-II) of NH-327E in the state of bihar 851.83 Cr 8.51 Bn
3 Days to go
23-Apr-2024
TOI : 67708526 India | Bihar
6. Sector:Bridges Construction of Green Field 4-Lane Highway (Tourist way of Rajgir connecting Buddhist Circuit) from Salepur to Rajgir at NH-82 via Noorsarai - Ahiyapur - Silao of Total Length 26.662 Km. in District of bihar on Engineering, Procurement & Construction (EPC) Mode INR 696.52 Cr INR 6.96 Bn
7 Days to go
27-Apr-2024
TOI : 70558079 India | Bihar
7. Sector:Bridges Construction of Green Field 4-lane Highway (tourist Way of Rajgir Connecting Buddhist Circuit) From Salepur to Rajgir at Nh-82 Via Noorsarai - Ahiyapur - Silao of Total Length 26.662 Km. in of bihar on Engineering, Procurement & Construction (epc) Mode. INR 696.52 Cr INR 6.96 Bn
52 Days to go
11-Jun-2024
TOI : 71266681 India | Bihar
8. Sector:Roads Construction of Additional 3-lane Bridge Over River Ganga for Connection Between Buxar and Bharauli on Nh-922 in the State of Uttar Pradesh and bihar on Hybrid Annuity Mode (2nd Call) INR 444.18 Cr INR 4.44 Bn
13 Days to go
03-May-2024
TOI : 70490423 India | Bihar
9. Sector:Road Transport Services Construction of 6 no. of Mangobandhar, Kendua, Tolesono, Jhajha, Narganjo and Bhairoganj Bypasses (Total Length-19.450km) along with 2 no. of DLP free Sections (total length-21.821 Km) to two lane with paved shoulders standard in State of bihar 414.42 Cr 4.14 Bn
11 Days to go
01-May-2024
TOI : 65276464 India | Bihar
10. Sector:Bridges Construction of Overbridge with Approach Road, High RCC Bridge. INR 165.73 Cr INR 1.65 Bn
38 Days to go
28-May-2024
TOI : 70440699 India | Bihar