Filter
Filter
Tender Description Value Due Date
1. Sector:Power Plant Supply of 150nb Cast Stainless Steel Gate Valves of Fly Ash System INR 1.00 INR 1.00
823 Days ago
16-Sep-2023
TOI : 64221197 India | Andhra Pradesh
2. Sector:Minerals Selection of Contractor for Operation & Maintenance of Lignite, Lime & ash handling systems of GMDC’s 2X125 MW Akrimota Thermal Power Station (ATPS). Refer Document
732 Days ago
16-Dec-2023
TOI : 66770642 India | Gujarat
3. Sector:Power Plant Procurement of Vent and Equlizing valves for Nuva feeders of dry ash handling systemat Ntpc Barh Refer Document
732 Days ago
16-Dec-2023
TOI : 67146195 India | Andhra Pradesh
4. Sector:Power Plant Procurement of WPIL Make Pumps Spares for Ash Handling Plant based onLPP and Budgetary Offer for NTPC Nabinagar Refer Document
564 Days ago
01-Jun-2024
TOI : 72029925 India | Andhra Pradesh
5. Sector:Power Plant Supply,Installation,Erection and Commissioning of pond Ash Conveying System along with all accessories including dewatering and recycling arrangement,Trial Operation and Work of Comprehensive Operation andMaintenance of Ash Slurry Conveying System fo INR 12.56 Cr INR 125.63 Mn
12 Days to go
29-Dec-2025
TOI : 90877571 India | Madhya Pradesh
6. Sector:Power Plant Work contract for round the clock operation and maintenance of ash handling system of Unit 5 at 1x 500 MW at SGTPS, MPPGCL, Birsinghpur. INR 8.57 Cr INR 85.76 Mn
12 Days to go
29-Dec-2025
TOI : 90643479 India | Madhya Pradesh
7. Sector:Coal and Lignite Tender Invited For Repair and Overhauling Service - Support Service Contract of Dry Ash System Operation & Maintenance of TPS II; As per Scope; Yes; Buyer Premises

Quantity 1

8.10 Cr 81.03 Mn
1 Day to go
18-Dec-2025
TOI : 90658597 India | Tamil Nadu
8. Sector:Power Plant Service contract for Biennial Operation and Maintenance (Mechanical and Electrical both) of Ash Handling Plant, Stage-I, SgTPP (2X300MW) ,WBPDCL INR 4.80 Cr INR 48.04 Mn
13 Days to go
30-Dec-2025
TOI : 89839867 India | West Bengal
9. Sector:Power Plant Balance job for revival of Integrated Ash Water Recovery System of AHP at Unit-6 under CAPEX 2023-2024 at STPS INR 3.58 Cr INR 35.86 Mn
14 Days to go
31-Dec-2025
TOI : 90088523 India | West Bengal
10. Sector:Non Classified 115 Annual Year Refurbishment Of The Refuse Crane And Bottom Ash Cranecontrol System As Well As Relevant Equipment NT$ 84.22 Lac NT$ 8.42 Mn
Closing today
17-Dec-2025
TOI : 90697715 Taiwan | Not Classified
  • Show
  • Tenders
Top