Requirement :
|
Retention of 02 crossing stations Ikran (IK) & Shri Ghasinagar (SHGN) (04 lines) in lieu of IBH sanctioned in AF-BKI Section. The work includes earthwork in excavation for foundations and floors of bridges, retaining walls, and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines. It involves setting out, dressing of sides, ramming of bottom, backfilling, and consolidation of layers, including disposal of surplus soil, shoring, and strutting as directed by the Engineer in charge. Earthwork, Cement Concrete, Plain Cement Concrete, Ordinary Portland Cement 43 grade, Ordinary Portland Cement 53 grade, Thermo-Mechanically Treated bars, Plate Girder, HSFG bolts, Aluminium paint, Steel work, Rails, Turnouts, Diamond crossings, Derailing switches, Track Ballast
|