|
Requirement :
|
The project involves the reinforcement and securing of the drinking water supply (AEP) for Tangier and its surroundings through the extension of the El Hachef treatment plant. This includes the construction of a new treatment line capable of producing a flow rate of 500 L/s of treated water, along with the necessary civil engineering and hydraulic equipment installations. The project aims to enhance the water supply security for the region by improving production from conventional resources until a desalination project is operational in 2029. El Hachef treatment plant extension, hydraulic equipment, pumping groups, water treatment filters, chlorination systems, dosing pumps, water storage tanks, automation and control systems, electrical equipment, civil engineering materials.
|