Subscription

1. Repairing and Restoration Work in Connection to Phe-pipe Laying Alongside with Construction of Trenches By Damaging Hard Shoulder and Road Crossing of Gojarmore to Ramhatitola (0.00 Kmp to 3.243kmp) in Different Stretches of Jagjibanpur Autpur Jangipara Road, Under Hooghly Highway Division No-i, in the District of Hooghly
Emergent Patch Repairing Work in Various Stretches From 1.00kmp to 1.475km, 1.725km to 2.20km, 2.50 Km to 3.25 Km, 9.50 Km to 10.50 Km, 10.7 to 11.35 Km and Thorough Surfacing at 1.475km to 1.625km, 2.20km to 2.325 Km, 3.60km to 3.74 Km, 10.50km to 10.605 Km of Bokpotaghat Ichangari Road, Under Serampore Highway Sub-division of Hooghly Highway Division-i, P.w.( Roads) Dte. in the District of Hooghly in the Year 2025-2026.
Emergent Repairing of Chanditala Seakhala Champadanga Road (sh-15) From Ch. 4.00 Kmp to Ch. 5.00 Kmp, Ch. 19.50 Km to Ch. 21.00 Kmp, Ch 23.00 Km to 26.00 Kmp, 28.00 Kmp To29.00 Kmp and 32.00 Kmp to 34.00 Kmp in Stretches Under Serampore Highway Sub Division of Hooghly Highway Division No. I, P.w.roads Directorate in the District of Hooghly During 2025-26.
Boinchee Bhastara Majinan Belmuri Road From 16.7km to 18.6 Km "restoration Estimate Due to the Cause of Damage for Underground Water Supply Pipeline Layout Executed By Public Health Engineering Directorate Within Dhaniakhali Block" Under Hooghly Highway Division No. I in the District of Hooghly.
Repairing of Old Premises of Hooghly Highway Sub-division (lalkuthi) Under Hooghly Highway Division No.i, in the District of Hooghly in the Year 2025-26.
Advance Collection of Stone Materials and Premixing the Same with Bitumen for Repairing of Rain Induced Bituminous Potholes as and When Necessary Basis on Different Roads Under Hooghly Highway Sub Division of Hooghly Highway Division No. I in the District of Hooghly During the Year 2025-26 (ph-a)
Advance Collection of Stone Materials and Premixing the Same with Bitumen for Repairing of Rain Induced Bituminous Potholes as and When Necessary Basis on Different Roads Under Arambagh Highway Sub Division of Hooghly Highway Division No. I in the District of Hooghly During the Year 2025-26 (ph-a)
Advance Collection of Stone Materials and Premixing the Same with Bitumen for Repairing of Rain Induced Bituminous Potholes as and When Necessary Basis on Different Roads Under Serampore Highway Sub Division of Highway Division No. I in the District of Hooghly During the Year 2025-26 (ph-a).
INR 34.10 Lac INR 3.41 Mn
2 Days to go
02/06/2025
TOI : 83714524 India | West Bengal

Subscribe to our service and get access to all similar Tenders.

Plan Service type Validity Plan Amount (INR)
TOD 0 1770
Email +Web 12 Months 5900
Email +Web 12 Months 9440
Email +Web 12 Months 11800
Email +Web 12 Months 21240
Top