Subscription

1. Amc for Various Maintenance Activities to Be Carried Out Under Planned and Emergency Outage Through Pl Outsourced Agency at 220kv Kalwa & 400kv Kalwa Under 400kv R S O&m Dn Kalwa for the F.y.2026-27. Repl. Single Terminal Clamp Replacement of Terminal Clamp with New One at Equipment Terminal Withremoval of Jumper From Both Ends with Crimping and Refitting for Single in Planned Outage.
, Pl_repl. Twin Terminal Clamp Replacement of Terminal Clamp with New One at Equipment Terminal Withremoval of Jumper From Both Ends with Crimping and Refitting for Twin in Planned Outage.
, Pl_termination 19cx2.5mm² Cable Both End Cable Termination of 19c X 2.5 Mm² at Both Ends as Per Termination Schedule Provided with Cable Glanding at Both Ends Panels/ Mb Etc. with Drilling of Suitable Size Holes for Cable Glands as Per Cable Sizes with Spare Holes as Directed, Glanding the Cable with Proper Size Glands to Make It Tight and Firm, Checking the Cable Cores From Both Side for Continuity with Suitable Arrangement and Providing the Cross Feruling as Per Cable Schedule to Both Ends of Cable and Crimping of Suitable Size Required Lugs as Per Cable Core Size with Suitable Crimping Tool Making It Tight Connection and Then Dressing Up the Same in Tbs Provided in Panels / Mb Etc. as Directed for the Following Cable with Sealing of Spare Holes ... By Providing Reqd Size Lugs , Glands and Ferules in Planned Outage
, Pl_dismantling 220kv Sus. Wt Wt Si Dismantling of 220 Kv Wave Trap Suspension Type with Removal of Jumper From Both Side, Suspension Hardware Along with Insulator String, Removal of Plate of Connection If Reqd to Beam Etc. in Planned Outage.
, Pl_laying of 4cx2.5mm² Cable Laying of 4 Core 2.5mm² Control / Power Cables on Existing Cable Trays in Cable Trenches with Aluminum Tags at Both Ends with Binding the Same on Cable Trays at Suitable Intervals with Dressing, with Segregation of Control & Power Cables Separate on Cable Trays Rows as Directed, the Cables Will Be Provided By Msetcl in Drums , the Same Are Required to Be Transported to Required Place and Unwounded with Turntable Smoothly Avoiding the Damages to the Cables in Planned Outage.
, Pl_repl. Qaud. Ten. Insulator String Replacement of Quad Tension Disc Insulator String with Removal of Hardware Connected, Jumpers Connected and Its Re-erection with New Insulators and Making the Connection of All Earlier Jumpers Etc. in Planned Outage.
, Pl_dismantling 4"ips Tube Wt Labour T&p Dismentling of 4 Ips Tube Including Supply of All Labour T&p Etc Complete in Planned Outage.
, Pl_dismantling 4cx2.5mm² Cable Dismantling of 4 Core 2.5mm² Control / Power Cables on Existing Cable Trays in Cable Trenches. Coiling and Stacking of Dismantled Cable at Site Store as Directed with Removal of Terminations at Both Ends with Removal of Glands Etc. in Planned Outage.
, Pl_crimping of 132/220kv Repair Sleeves Crimping on 132/220kv Conductor for Repair Sleeves (overhead) with Suitable Size Capacity Crimping Machine with Suitable Size Dies in Planned Outage., Pl_erection of 88-120kv La Erection of 88-120 Kv Lightning Arrester in Planned Outage.
, Pl_termination 12cx2.5mm² Cable Both End Cable Termination of 12c X 2.5 Mm² at Both Ends as Per Termination Schedule Provided with Cable Glanding at Both Ends Panels/ Mb Etc. with Drilling of Suitable Size Holes for Cable Glands as Per Cable Sizes with Spare Holes as Directed, Glanding the Cable with Proper Size Glands to Make It Tight and Firm, Checking the Cable Cores From Both Side for Continuity with Suitable Arrangement and Providing the Cross Feruling as Per Cable Schedule to Both Ends of Cable and Crimping of Suitable Size Required Lugs as Per Cable Core Size with Suitable Crimping Tool Making It Tight Connection and Then Dressing Up the Same in Tbs Provided in Panels / Mb Etc. as Directed for the Following Cable with Sealing of Spare Holes ... By Providing Reqd Size Lugs , Glands and Ferules in Planned Outage
, Mobil&demob. Gang/eqpt Mobilization/demobilization of Oil Filter Plant and Gang for Work
, Pl_crimping on 400kv Condr Repair Sleeve Crimping Works on 400 Kv Conductor for Repair Sleeves ( Overhead ) with Suitable Size Capacity Crimping Machine with Suitable Size Dies in Planned Outage., Pl_crimping 132/220kv Condr. Jumper Cone Crimping Works for 132 Kv/ 220 Kv Conductor with Suitable Size Capacity Crimping Machine with Suitable Size Dies for Jumper Cone at Ground in Planned Outage., Cold Washing of 400kv Susp. Insu. String Cold Line Washing of Insulator-400kv Suspension Tower
, Pl_remove&erection of 145kv Cb Pole Removal & Erection of 145 Kv Circuit Breaker Pole in Planned Outage.
, Pl_crimping 400kv Condr. Jumper Cone Crimping Works for 400 Kv Conductor with Suitable Size Capacity Crimping Machine with Suitable Size Dies for Jumper Cone at Ground in Planned Outage., Repl. 245kv Bushing of T/f Replacement of 245 Kv Bushing of 220/22 Kv 50 Mva Transformer • Draining Ofoil.• Removal of Old Bushings of Cgl Make T/f-i (sr. No. 24596)• Removal of Turret.• Replacement of Leads.• Crimping of Ferrules with New Leads.• Brazing of Leads with New Trimble.• Design of Leads, Cylinder &other Arrangement.• Fixing of Insulating Cylinder Press Board so as to Provide Adequate Dielectric Strength After Removal of Old Ct Bushings.• Modification of Turrets & Pipe Line (if Required)• Re-errection Ofturrets.• Erection of Bushings.• Provide New Gaskets.
, Repl. 220kv Stn Insulator String Replacement of 220 Kv Single Tension Insulator String (stn) with Removal of Hardware Connected, Jumpers Connected and Its Re-erection with New Insulators and Making the Connection of All Earlier Jumpers.
, Pl_repl. Jumper Connect. Eqpt for Quad Replacement of Jumper Connection with Its Removal with Spacers From the Equipment Terminal with Removal of Connector and Its Re Erection with Provided Terminal Clamps at Both Ends for Quadruple Conductor Jumper in Planned Outage.
, Pl_repl. Qaud. Susp. Insulator String Replacement of Quad Suspension Disc Insulator String with Removal of Hardware Connected, Jumpers Connected and Its Re-erection with New Insulators and Making the Connection of All Earlier Jumpers Etc. in Planned Outage.
, Pl_repl. Ips Tube Both Ends & Re-conn. Replacement of Ips Tube From the Equipment Terminal in 400 Kv Switchyard with Removal of Terminal Connectors at Both Ends and Its Re-errection with Provided Terminal Connectors in Planned Outage.
, Pl_dismantling 10cx2.5mm² Cable Dismantling of 10 Core 2.5mm² Control / Power Cables on Existing Cable Trays in Cable Trenches. Coiling and Stacking of Dismantled Cable at Site Store as Directed with Removal of Terminations at Both Ends with Removal of Glands Etc. in Planned Outage.
, Pl_laying of 7cx2.5mm² Cable Laying of 7 Core 2.5mm² Control / Power Cables on Existing Cable Trays in Cable Trenches with Aluminum Tags at Both Ends with Binding the Same on Cable Trays at Suitable Intervals with Dressing, with Segregation of Control & Power Cables Separate on Cable Trays Rows as Directed, the Cables Will Be Provided By Msetcl in Drums , the Same Are Required to Be Transported to Required Place and Unwounded with Turntable Smoothly Avoiding the Damages to the Cables in Planned Outage.
, Pl_dismantling 12cx2.5mm² Cable Dismantling of 12 Core 2.5mm² Control / Power Cables on Existing Cable Trays in Cable Trenches. Coiling and Stacking of Dismantled Cable at Site Store as Directed with Removal of Terminations at Both Ends with Removal of Glands Etc. in Planned Outage.
, Pl_repl. Jumper Connect.-twin Stub Bus Replacement of Jumper Connection (removal and Refitting) with Spacers From Twin Stub Bus with Its Removal From Suspension Insulator String Hardware Etc. From Both Ends and Re-erection with Provided Tenninal Clamps at Both Ends in Planned Outage.
, Pl_stringing Twin Conductor Span Stringing of Twin Conductor Span Per Phasewith Hoisting of Disc Insulator Along with Hardware, Crimping of Conductor in Dead End Cone with Suitable Size Crimping Machine and Dies with R
INR 39.21 Lac INR 3.92 Mn
4 Days to go
17/06/2026
TOI : 96965060 India | Maharashtra

Subscribe to our service and get access to all similar Tenders.

Plan Service type Validity Plan Amount (INR)
TOD 0 1770
Email +Web 12 Months 5900
Email +Web 12 Months 9440
Email +Web 12 Months 11800
Email +Web 12 Months 21240
Top